Hot search: shredder  chest  dresser 
 

Folding Partition Walls For Home

Click on the image to check the artwork
unit price: negotiable
min amount:
amount:
period for delivery: Consignment Deadline Days
area: Guangdong
Expiry date : Long Effective
last update: 2017-12-25 13:07
view count: 106
enquiry
Company Profile
 
 
Product details

hotel movable wall

The hotel partition project:

The hotel movable Partition project main contain the hall, restaurant, hotel function room and customers bathroom partition .it mainly use the glass partition wall and movable partition wall The movable Partition with a variety of style,can reach the effect of space separate and sound insulation. Hotel activity partition system is crucial in the whole hotel decoration, in addition to security good partition panel and activities, mainly embodied in the installation and construction.

Product Specification:

Product Name

Hotel movable partition wall

type

Movable,sliding

Base Materials

acoustic materials ,aluminum

Skeleton

aluminum

Surface material

gypsum board

Main Accessories

Track,hang wheel,transfer bar

Finish

Fabric,leather

width

1200mm

high

Within16m

thickness

100mm

Coefficient of sound insulation

53db

Fireproof

B1

Environmental

E1

function

room partition,soundproof,fireproof,room decorative etc

application

Working place,entertainment place,school,hotel,hall,exhibition hall and so on

The above width,high,thickness,as well the finish can be customized

Construction method:

1.Track installation:Suspension fixed way is at the top of the partition board install the hanging wheel, and connected to the track suspension. The track and hanging wheel should be chosen according to the partition size and load weight.

2.partition Panel installation: according to the design drawing, draw on each partition panel to mark the line wheel, fix the wheel with screws on the partition board top; Then the panel be put into track, let each panel in the perpendicular to the ground; Test and push-pull flexible rotation, and finally to fixed connection.

3.Debugging: movable panel need to discretion, sealing and so on debugging after installed. Then cleaning up the panel, complete the installation work

Total0bar [View All]  Related Comments
 
More>other products

[ ProductsSearch ]  [ Send Fav ]  [ Share ]  [ Print ]  [ Send Report ]  [ Close ]

 
Home | Products | Suppliers | News | Tradeshow | Sitemap | Message | RSS Feed